Go top
Project information

Application of the ENTSO-e cost-benefit analysis method to Aguayo II pumped-hydro storage 2024

A. Ramos L. Olmos L. Rouco E. Lobato

June 2024 - September 2024

Funding entity Repsol Generación Eléctrica, S.A.U


Report on the application of the ENTSO-e 2024 cost-benefit analysis method to Aguayo II pumped-hydro storage.


Layman's summary: Report on the application of the ENTSO-e 2024 cost-benefit analysis method to Aguayo II pumped-hydro storage.



Repsol_AguayoII_2024